InRoads

Founded in 1982, InRoads delivers spray sealing services to state road authorities, local municipalities and civil contractors in South Western, Western and Northern Victoria as well as Eastern SA. Continual investment in equipment and technology coupled with local experience makes for outstanding service.

Address

8 Bracken Street,
Horsham, Victoria 3402

Ph: +61 3 5382 4406 Fx: +61 3 5381 1541
Vic Roads

Towards More Robust Seals For High Trafficked Roads

Government

February 2017

With the increase in the number of heavy vehicles using the roads, VicRoads is anticipating the need to place more robust, waterproof and durable seals in its periodic maintenance treatments to protect existing pavements. For this reason, VSA undertook some trials at its quarry, applying four treatment types. Two were conventional (XSS 14/7 and 10mm emulsion seal placed under a GRS 14/ 7) and two were innovative: 20/7/7 based on South Africa technology and XSS 20/10. All seal trials are being placed on a previously primed granular surface. https://vimeo.com/208568867  

Primal Surfacing

Primal has a highly successful history of developing and incorporating innovative new technology and equipment. They have the youngest fleet, with the most highly advanced equipment in Australia – having invested over $5 million in capital equipment in the last 2 years. With a flexible and responsive approach to service, and a diverse range of equipment, Primal can gear up or down for any job, big or small.

Address

9 Weddel Court,
Laverton North, Victoria 3026

Ph: +61 3 9369 9931 Fx: +61 3 9369 9932

Primer Seal Trial: Lower Trafficked Rural Pavements in Yarriambiack Shire

Council

March 2015

For this project, we trialled a variety of primer seal pavement treatments on a low trafficked rural road. The purpose was to help customers find a cost effective treatment for future primer seals and to evaluate the life span of different primer seal treatments. The treatment types were 5pts BSRS, C320, HBCE and Polyseal and the material involved 7mm, 10mm and 7mm/14mm, with standard 5ptsBSRS Primerseal 14mm/7mm 5km down the road to compare. We are currently awaiting evaluation feedback from the client.

CentreState Asphalting

CentreState has been offering a broad range of asphalt and spray sealing solutions for over 10 years. As a very customer- and quality-focussed business, our goal is to provide a quality bituminous pavement solution on time and within budget.

Address

3 Lewis Drive,
Castlemaine, Victoria 3450

Ph: +613 5470 5028 Fx: +61 3 5470 5839
Vic Roads

CentreState Completes 2016 VicRoads Northern Region Supply and Placement of Asphalt Contract

Government

January 2016

Centre State Asphalting (CSA) undertook large-scale modifications to its asphalt plant in the second half of 2015 to enable the manufacture of a full range of VicRoads mixes, and recycle waste products. This enabled CSA to target and successfully secure the VicRoads Northern Region annual maintenance contract for the first time in early 2016. We began on 6 January, with due date of completion achieved on 14 May 2016. The challenge with undertaking this contract, which involved 25,140 tonnes of asphalt with 20SI, 10SMAH, 14HP, 14H, 10H, 10OG and 20SP mixes, was the detailed planning and compliance with exacting VicRoads contractual requirements over a broad location of pavements from Swan Hill to the Calder Highway near Gisborne. It also required 21,870m2 of spray sealing (10mm Geo Seal and 10mm SAMI). Every pavement location was unique in terms of stakeholder management, risk profile, and construction requirements. In particular, a large segment of the works was scheduled to be undertaken at night within Bendigo itself, requiring careful traffic management and residential/business liaison. In addition, CSA manufactured and placed stone mastic asphalt for the first time, and although challenging at first, many valuable lessons and improved construction techniques were quickly acquired throughout the contract and delivered successfully.

CentreState Asphalting Asphalt Production

Strategically located between the regional centres of Bendigo and Ballarat the Centre State Asphalting production facility is ideally positioned to service central Victoria as well as the broader Northern and Western districts.

Commissioned in 2011, the company owned 120 tonne per hour production facility meets stringent EPA emission standards with a newly installed baghouse dust and fume extraction system.

Supported by a fully registered NATA accredited laboratory, the computer controlled production facility manufactures a range of consistent asphalt mixes in accordance with VicRoads registered mix designs.

Process improvement initiatives slated for 2014 are focused on expanding the range of products, reducing energy consumption and increasing production flexibility. The CentreState Asphalting production plant will soon become regional Victoria’s leading environmentally focused facility with the introduction of recycled materials and the use of natural gas as the primary energy source.

Asphalt delivery from the production facility is supported by a range of truck configurations to provide maximum flexibility to delivery to all types of jobs, from driveways to major freeway upgrades, and distances as far as the New South Wales and South Australian borders under all temperature ranges.

CentreState Asphalting Material Testing

Centre State Asphalting pride themselves on providing a range of quality Vicroads approved and speciality asphalt mixes to suit all pavement requirements. 

The laboratory, based at the asphalt production facility, is NATA registered and operates to a strict set of externally audited quality standards.   The laboratory’s focus is driven by our customers’ requirements for accurate testing and reporting of asphalt mix constituents, and providing the right asphalt type to match each individual customer’s operating pavement environment.

To achieve consistent asphalt mixes, the production facilities employees’ focus on managing the quality of material inputs, and carefully monitor and manage each stage of the production process.  Each truck load of asphalt mix is visually inspected to ensure uniformity, and representative random samples tested for consistency.

The quality focus of CentreState extends throughout the company.  The contracting services quality system is audited as part of the Vicroads accreditation system whenever work is undertaken on the State road network.  The number one priority when undertaking any work is the safety of employees, subcontractors, clients and most importantly the general public.

CentreState Asphalting Contracting Services

Strategically located between the regional centres of Bendigo and Ballarat the Centre State Asphalting production facility is ideally positioned to service central Victoria as well as the broader Northern and Western districts.

Commissioned in 2011, the company owned 120 tonne per hour production facility meets stringent EPA emission standards with a newly installed baghouse dust and fume extraction system.

Supported by a fully registered NATA accredited laboratory, the computer controlled production facility manufactures a range of consistent asphalt mixes in accordance with VicRoads registered mix designs.

Process improvement initiatives slated for 2014 are focused on expanding the range of products, reducing energy consumption and increasing production flexibility. The CentreState Asphalting production plant will soon become regional Victoria’s leading environmentally focused facility with the introduction of recycled materials and the use of natural gas as the primary energy source.

Asphalt delivery from the production facility is supported by a range of truck configurations to provide maximum flexibility to delivery to all types of jobs, from driveways to major freeway upgrades, and distances as far as the New South Wales and South Australian borders under all temperature ranges.

Western Quarries

After a 3 year extensive search of the Western Districts for a high grade aggregate source, VSA Roads is proud to announce the commencement of crushing operations in late 2015. The finest quality aggregate will be used for bituminous surfacing and asphalt production on projects throughout South Western and Western Victoria. The deposit meets VicRoads class A sealing aggregate standard and has a polishing value of 62; the highest assigned value in Victoria.

Address

4875 Pyrenees Highway,
Ararat, Victoria 3377

Ph: +61 3 5352 2660 Fx: +61 5352 2770

Western Quarries Enables Installation of 75 Wind Turbines in Ararat Area

Engineering company

June 2016

Downer EDI Engineering Power required our expertise to deliver various products so that it could effectively complete the installation of 75 wind turbines in the Ararat area. We began in June 2016 by delivering 40mm base course to Tower 55, on the Warrak side of the project. By February 14, 2017, we had finished delivering 20mm Class 3 Crushed Rock Wetmix to CG2 for electrical trench fill ins. Overall, the project included 40mm basecourse used in the construction of nearly 50 kilometres of internal road networks; 40mm base course used to create equipment hardstands and wind tower foundations, gabion and selective broken rock for draining purposes; various aggregates and crushed rocks for use in the construction of the electrical substation and various products used to form work compound bases and trench fill-ins. Depending upon Downer’s requirements, mixes were coordinated on a day-to-day basis, adding further challenges. Most importantly, the client was very happy with the successful completion of the project.

TopCoat

TopCoat is a long established producer of asphalt with production facilities in Wingfield Adelaide and a mobile production facility currently in Alice Springs. The company is supported by specialist asphalt paving crews and a highly respected Product Testing Laboratory. TopCoat is an early adopter of new technology and a leading innovator of recycled pavements.

Address

50-54 Millers Road,
Wingfield, SA 5013

Ph: 08 8347 2030